SISMABONUS. Structural design and related seismic authorizations and work commencement permits with the competent authorities. Scaffold design and preparation of PiMUS (Assembly, Use, and Dismantling Plan), etc.
Legislative Decree 81/08. Compliance with workplace safety regulations for companies in any sector. Safety coordination during the design and execution phases on construction sites, etc.
Design of fire protection systems. Preparation of documentation to obtain authorizations for activities subject to inspection by the Fire Brigade, etc.
Design of civil and industrial electrical systems, plumbing systems, gas lines, boiler rooms, air handling systems, renewable energy production systems, etc.
Design and assessments aimed at the energy redevelopment of existing buildings, energy audits (thermal imaging), energy certifications, EPCs (Energy Performance Certificates), etc.
Cantierizzazione del progetto, cronoprogrammazione, supervisione dei lavori secondo le disposizioni di legge e i gli obblighi contrattuali, contabilità di cantiere, collaudo, ecc.
Feasibility and planning studies, risk assessments, corporate emergency plans, fire compliance opinions, technical consulting (CTP), etc.
Commercial SCIA, urban planning SCIA, CILA, public land occupation (OSP), property subdivisions, ownership transfers, certificates of occupancy, cadastral registrations (DOCFA), etc.
Cisterna di Latina, progetto
Aprilia, struttura in acciaio
Roma, Ala Brasini
Bagnoli, progetto struttura